2019 Haunted House
This project was such an epic undertaking. It took nearly two months to build, was delayed by the strike, but we were able to put it up one week after the strike ended. Designed by Mr. B with help from Dean Alleyne and students. Built by students and Dean Alleyne, with help from Mr. B.
|
|
|